In 2019 Warren Environment Was Contracted To Replace A Stack At A Cement Plant. The Existing Carbon Steel Stack Was Badly Corroded And Had Been Replaced Twice Before. We Knew A Change In Material Was Needed, So We Suggested Duplex 2205. In Addition To The Replacement Stack The Client Wanted An Easier Way To Access The EPA Test Ports. An OSHA Compliant Stair & Platform System Was Designed And Installed By Warren.